Funding entity Indra
Participated by Administrador de Infraestructuras Ferroviarias
The main goal of this project is the investigation and development, in collaboration with ADIF, of new models to calculate train timetables. The main module will optimise the distribution of recovery times to minimise the energy consumption. In addition, simulation based models will be developed to compute the maximum load of a train along a line, and the characteristic slope of a line.
APLiCA2